Migrating To FIN 5.0

Below we'll be covering the migrating process from FIN 4.5 to FIN 5.0. A FIN 4.5 project cannot just be loaded to FIN 5.0 and vice versa. Once migrated to FIN 5.0, a project can no longer be reverted back to FIN 4.5. The only way to have a project running back in FIN 4.5 is the backup made prior to migrating, which if the user does do this will lose any historical data and other stuff from the time it was down and using the FIN 5.0 project version. FIN 4.5 graphics, programs, schedules etc saved on a server can be uploaded to FIN 5.0, but not the other way around. Made an issue in Jira for Minh to see if he can modify backup and restore funcs to make them work. Will need to update ids if Minh can't do it.

Preparing Project For FIN 5.0

Prior to migrating, we want to prepare the project and make sure we're ready to start the migration process as smoothly as possible. The user will first want to go through the Prepping Project for FIN 5.0 documentation.

Migrating Project To FIN 5.0

Once the user has prepped the project and ready to migrate to FIN 5.0, they can begin the Migration Process.